129748908983593750_731Hong Beijing February 27 (reporter Li Wenrui) today (27th), sanyuan bridge in Beijing Metro Line 10, line to appear upward interval of Paeonia lactiflora contact rail trip.
Emergency plan for the prompt start of the MTRC, for the disposition of repair personnel rushed to the scene. Operation organization segment operations organization run, up from gully station toZhen station run, run downward from the sturdy pine tree train station to agriculture exhibition. The station, trains are to take measures to inform
eq2 platinum, and to strengthen organizations to ease passenger flow at the station.
18:37, troubleshooting is complete, operational recovery. It is understood that this thing have an impact on late peak Line 10 subway train, line line Line 1, Line 5, and Line 10 of the limiting of the transfer station respectively, to take the necessary measuresEffects.
Beijing Subway company, find this reason.
Added: segment running have to run round. Hong messages according to user Twitter messages
age of conan gold, 27th in Beijing Metro Line 10, line left and right because the device is temporarily stopped
tera power leveling, now all stations. (Editors: Ma Tung)
No comments:
Post a Comment